Showing posts with label sewing room. Show all posts
Showing posts with label sewing room. Show all posts

Sunday, September 21, 2025

Puppy Paw Stamp of Approval

The girls fully endorse and approve of the new sewing room.  If they could, they'd use their little stompers to give a puppy paw stomp of approval! They finally have windows that they can use to see what is going on outside...on two sides of the house, no less!


 For some reason they remind me of kids looking for Santa Claus!

Wednesday, August 27, 2025

The Long and Short of it

Moving day finally arrived....as in, time to put my sewing room together. The long arm sewing machine pieces have been residing in the corner of the tack room in the barn. We brought them over to the house, and unloaded them. 

Between the two of us we found another 8-10 cartons of craft supplies, and those came over to the new sewing room/studio, creation space, whatever I'm going to call it.  


Then I had the fun of unpacking, putting everything in its place, and assembling the long arm machine. 


We are finally getting there!




Friday, August 8, 2025

A Garage no More

Our truck won't fit in our garage - even if it is empty!.The garage was built almost 30 years ago, and today's trucks are just a tad bit bigger. The garage wasn't really useful for vehicles, but I loved the idea of this space becoming a studio, or craft room, for my sewing and quilting. (Especially since we didn't have an extra bedroom I could use.)

Here's the garage before the movers brought more boxes and furniture!

We stored a lot of things that didn't fit in the house in the garage. We had already cleared a lot out when I thought to take a picture. We also have more stuff in the barn...and now, we've added to those piles!

We would not need the screen, so I put it out on local sale feeds and had several inquiries. The screen was gone the next day.

We have cleaned almost everything out. We need a bit of help with some of the larger pieces, but otherwise we are finished. 

Day 1

July 22, 2025
The guy on the floor is OK, he's marking the wall for the top of the concrete

A form is put up to hold the concrete to the designated level

Day 2

The concrete arrives. This sure looks like grueling work!

The floor is almost finished and it will be level with the floor in the rest of the house. 
After the concrete dried a bit, the men smoothed it off some more. 
(I asked if this was the time to let the dogs out!)

Day 3

A shelf is removed to allow the installation of a mini split AC

The garage door and controller are removed. 

The mini split is installed, and functional. It will keep me cool when it is warm, and has heat for when it turns chilly. The window for the new wall leans against the wall. 

The cinder block has been delivered.

Day 4

The wall is going in!


Day 5

The utilities are now behind bars, and will be walled in when the electrician has run wiring!

We have a window....

... and we have a door!

Day 6

We have electric wiring, partially completed,
and we have flooring waiting for installation when the time is right.

Day 7 & 8

More electrical. 

I have to give the electrician a lot of credit for hanging in there. He was in a car accident four months ago and shattered both ankles. He has pins and plates holding his ankles together, and it is evident that walking isn't very comfortable. Yet, he worked three short days (Saturday and Sunday too) to get the job far enough along that the contractor could move on with the next step. 




Day 9

We have walls. We have a utility closet! 

Day 10
August 7, 2025

The stucco guys came and textured the cinderblock walls, in and out.



The sheetrock guy played with his mud and tape. He wasn't feeling well and the contractor told him to go home to rest, and seek medical care. 


We are 10 working days into our project. I am thrilled and I'm counting the days until I can move my sewing things into the room and become truly settled in our house. Unless there are huge delays, I'm thinking that will happen in 10-14 days. Hooray!








.


Sunday, August 3, 2025

Sliding Puzzle

I used to love this sort of puzzle. 

Currently, I seem to be "living" that puzzle, and I don't find it quite as entertaining!

Out of necessity, our spare bedroom is doing double duty as my sewing room and potentially a guest room. However I challenge any guest to come visit...and feel that we have welcomed them! While we wait for the garage to be converted into a sewing/craft area for me, we have many things that for both rooms shoehorned into one.


If I need something out of the closet I need to roll away two carts, move a roll of batting and move two folding chairs. 

If someone wants to use the only bed that is made, they have to crawl up to the head of the bed. The other bed used to be in the garage, which allowed a bit more room, but once we started work out there, it had to come in. along with various lamps and lamp shades and stacks of IKEA shelving.

The good news is that even as I type this, the garage is slowing being transformed into my sewing/crafting room. A day-by-day recap of that transformation will be posted upon completion. 

How exciting is that?!





Six Degrees of Separation - Fred Harvey

 During our Rt 66 trip I had more than one occasion to hear about Fred Harvey and his connection to tourism through his hotels and his conne...