The Mister has been working on finishing his workshop for weeks. When we had the RV barn built, extra space was included and designated as his workshop area. Our contractor for other jobs around the house framed in the workshop, put in joists for a loft storage area, put down sheathing for a floor and built stairs to the loft.
The Mister took over the rest of the job, and has been working at wiring the shop for outlets, putting in lights and adding additional power for overhead fans and a vacuum system. A while back he began purchasing and ordering insulation batts for the interior walls and the ceiling. The insulation for the ceiling has been delayed. The Mister is less than happy as he wants to get moving with the sheetrock and flooring so the finish details can be completed and he can begin to enjoy the workshop.
Today he finally got a notice that his shipment of insulation would be delivered. And, it arrived. Here it is: